JOSEPH C. SPERO, United States Magistrate Judge.
This action was filed on November 2, 2012. On November 24, 2012, the Complaint and summons were personally served on Laurin Hunt, the agent who is designated by law to accept service of process on behalf of Westech Roofing. See Docket No. 12. Defendant did not answer or appear and on May 1, 2013, the Clerk entered default against Defendant. On January 6, 2014, the Court denied Defendant's request that the Court vacate the default. Currently before the Court is Plaintiff's Amended Motion for Default Judgment Against Defendant Westech Roofing ("Motion"). A hearing on the Motion was held on March 21, 2014. At the request of the Court, Plaintiffs submitted supplemental materials on April 18, 2014. Defendant filed a response on April 28, 2014 and Plaintiffs filed a reply on May 5, 2014. For the reasons stated below, the Motion is GRANTED.
Plaintiffs are the trustees of the Bay Area Roofers Health & Welfare Trust Fund, Pacific Coast Roofers Pension Plan, East Bay/North Bay Roofers Vacation Trust Fund, Bay Area Counties Roofing Industry Promotion Fund, and Bay Area Counties Roofing Industry Apprenticeship Training Fund. Complaint at 2. Plaintiffs allege that the trust funds are employee benefit plans within the meaning of §§ 3(1) and (3), as well as § 502(d)(1) of ERISA, 29 U.S.C. §§ 1002(1)
Defendant Westech Roofing ("Westech"), a California corporation, entered into a written collective bargaining agreement with Local Union 81 of the United Union of Roofers, Waterproofers and Allied Worker, AFL-CIO. Complaint at 3; Declaration of Sandy Stephenson in Support of Motion for Default Judgment Against Defendant Westech Roofing [Docket No. 19-1] ("July 12, 2013 Stephenson Decl.") ¶ 2 & Ex. A (Individual Employer Agreement); id., Ex. 2 (Working Agreement) ("Collective Bargaining Agreement" or "CBA"). The CBA incorporates the trust agreements of the Trust Funds and requires employers to make fringe benefit contributions to the Trust Funds on a regular basis for work performed by covered employees. Id., Ex. B, Articles XVIII-XXI.
Under the Trust Agreements, employers are required to submit a monthly report to the Trust Funds identifying the covered employees who worked for the employer that month as well as the fringe benefit contributions due for each covered employee. See Declaration of Sandy Stephenson in Support of Plaintiffs' Supplemental Briefing ("April 18, 2014 Stephenson Decl."), Ex. HH (Trust Agreement of the Roofer's Local Union No. 81 Area Health and Welfare Trust Fund ("Health and Welfare Trust Agreement")), Section III; id., Ex. II (Pacific Coast Roofers Pension Trust Agreement), Section III; id., Ex. JJ (Trust Agreement of the East Bay/North Bay Roofers Vacation Trust Fund, Section III; id., Ex. KK (Amended Agreement and Declaration of Trust Bay Area Counties Roofing Industry Apprenticeship Training Fund), Section III. The Trust Agreements provide for liquidated damages in the event contributions are delinquent; where legal action has been commenced to collect delinquent contributions the amount of liquidated damages is 20% of the late contribution. Id., Ex. HH (Health and Welfare Trust Agreement), Section III(C)(2); id., Ex. II (Pacific Coast Roofers Pension Trust Agreement), Section III(C)(2)(b)(i); id., Ex. JJ (Trust Agreement of the East Bay/North Bay Roofers Vacation Trust Fund), Section III(C)(2); id., Ex. KK (Amended Agreement and Declaration of Trust Bay Area Counties Roofing Industry Apprenticeship Training Fund), Section III(B) (incorporating liquidated damages policies and procedures of Health and Welfare Trust). The Trust Agreements also provide for interest on unpaid contributions (but not on liquidated damages) at a rate of 10%. Id., Ex.
Under the Trust Agreements, the trustees are given the authority to enact rules and regulations governing the collection of delinquent contributions. Id., Ex. HH (Health and Welfare Trust Agreement), Section III(H); id., Ex. II (Pacific Coast Roofers Pension Trust Agreement), Section III(H); id., Ex. JJ (Trust Agreement of the East Bay/North Bay Roofers Vacation Trust Fund), Section III(H); id., Ex. KK (Amended Agreement and Declaration of Trust Bay Area Counties Roofing Industry Apprenticeship Training Fund), Section III(B) (incorporating regulations of Health and Welfare Trust but reserving right of trustees to revoke that delegation of authority). However, employer liability is limited to the liabilities that are expressly set forth or authorized in the Trust Agreements, the CBA or the employers' individual contribution agreements. Id., Ex. HH (Health and Welfare Trust Agreement), Section III(I); id., Ex. II (Pacific Coast Roofers Pension Trust Agreement), Section III(I); id., Ex. JJ (Trust Agreement of the East Bay/North Bay Roofers Vacation Trust Fund), Section III(I); id., Ex. KK (Amended Agreement and Declaration of Trust Bay Area Counties Roofing Industry Apprenticeship Training Fund), Section II(C).
The rules and regulations for collecting employer contributions are set forth in a document entitled "Bay Area Roofers Trust Funds: Collection Policies" (hereinafter, "Collection Policies"), which went into effect in June 2013. July 12, 2013 Stephenson Decl., Ex. D.
In the Complaint, Plaintiffs alleged that Westech failed to make required payments to the Trust Funds and that there were contributions due and owing for the months of June through September 2012. Complaint at 3. The Complaint sought to recover these contributions, as well as any additional contributions that might become due and owing during the course of this litigation, under ERISA, 29 U.S.C. § 1132. Id. at 3-4. Plaintiffs also sought an award of liquidated damages, interest, attorneys' fees and costs. Id. at 4-5. Finally, the Complaint asked the Court to "enjoin the defendant from violating the terms of the collective bargaining agreement and the Trust Agreements for the full period for which defendant is contractually bound to
After default was entered against Westech, on May 1, 2013, Plaintiffs filed a motion for default judgment. See Docket No. 19. As Westech continued to make payments on the delinquent contributions, rendering Plaintiffs' damages calculations moot, the Court denied Plaintiffs' motion without prejudice to refiling with updated damages calculations and supporting evidence. See Docket No. 33. In the meantime, the Court denied a motion by Westech to set aside the default, finding that Westech was properly served and that its failure to appear in this action was culpable. See Docket No. 40.
On January 23, 2014, Plaintiffs filed an amended motion for default judgment (the instant motion). During the course of briefing (both the normal prehearing briefing and the round of supplemental briefing that followed the motion hearing), the amounts sought by Plaintiffs have been revised several times. First, while the initial motion requested damages covering the period of June 2012 through November 2013, in Plaintiffs' most recent brief, filed on May 5, 2014, Plaintiffs request damages for the period of June 2012 through March 2014.
Plaintiffs have applied for a default judgment in this action on the basis that Defendant has failed to plead or otherwise defend or appear after valid service. Under Federal Rule of Civil Procedure 55(b)(2), the court may enter a default judgment once the Clerk, under Rule 55(a), has entered the party's default
Eitel v. McCool, 782 F.2d 1470, 1471-72 (9th Cir.1986). In making its decision, the court takes all factual allegations in the complaint, except those relating to damages, as true. TeleVideo Systems, Inc. v. Heidenthal, 826 F.2d 915, 917-18 (9th Cir. 1987) (citing Geddes v. United Fin. Grp., 559 F.2d 557, 560 (9th Cir.1977)). Where a court finds that default should be granted, it may award damages if the plaintiff satisfies its burden of proving the damages through evidence. See id.
Westech is not exempt from default judgment on the basis that it is an infant, incompetent, soldier or sailor. The Court further finds that Plaintiffs' claims are well-pleaded. Plaintiffs have offered evidence that Westech entered into a collective bargaining agreement requiring it to make timely fringe benefit contributions to the Trust Funds and that Westech has failed to comply with this obligation. Consequently, Plaintiffs state a claim under ERISA, 29 U.S.C. § 1145.
Once liability is established through a defendant's default, a plaintiff is required to establish that the requested relief is appropriate. Geddes v. United Fin. Group, 559 F.2d 557, 560 (9th Cir.1977) (citing Pope v. United States, 323 U.S. 1, 12, 65 S.Ct. 16, 89 L.Ed. 3 (1944)). Under ERISA, an employee benefit plan that obtains judgment in its favor in an action for unpaid contributions under 29 U.S.C. § 1145 is entitled to the following forms or relief:
29 U.S.C. § 1132(g)(2). This section further provides that "[f]or purposes of this paragraph, interest on unpaid contributions shall be determined by using the rate provided under the plan, or, if none, the rate prescribed under section 6621 of Title 26. Id.
In Idaho Plumbers & Pipefitters Health and Welfare Fund v. United Mech. Contractors, Inc., the Ninth Circuit addressed whether a trust fund could seek liquidated damages under ERISA, 29 U.S.C. § 1132(g)(2), based on the late payment of employer contributions where no contributions remained unpaid when the action was initiated. 875 F.2d 212, 214-215 (9th Cir.1989). The court found that it could not, holding that ERISA's liquidated damages provision applies only "when (1) the fiduciary obtains a judgment in favor of the plan, (2) unpaid contributions exist at the time of suit, and (3) the plan provides for liquidated damages." Id. The court went on to hold, however, that ERISA does not preempt alternative contractual remedies in situations where § 1132(g)(2) does not apply. Id. at 217 (legislative history "indicates that Congress intended only to preempt laws limiting liquidated damages to an amount below the 20% level when the terms of § 1132(g)(2) are satisfied"). Thus, where a trust agreement provides for liquidated damages but ERISA does not apply, court must apply federal common law to determine whether the provision is enforceable. Id. at 217-218. Under federal common law, a liquidated damages provision is enforceable so long as 1) "the harm caused by a breach [is] very difficult or impossible to estimate"; and 2) "the amount fixed [is] a reasonable forecast of just compensation for the harm caused." Id. In Idaho Plumbers, the court concluded that the 20% liquidated damages provision in the trust agreement (which gave rise to liquidated damages of over $9,000 for a contribution that was paid only four days late) constituted a penalty rather than a reasonable forecast of just compensation for the harm caused and therefore was unenforceable. Id. at 218.
There have been disagreements among the district courts on certain questions relating to the application of Idaho Plumbers. First, courts in this district have disagreed as to whether Idaho Plumbers allows for the award of liquidated damages on late contributions that were paid before an action was filed so long as there were unpaid contributions for other months at the time the suit was initiated. See Trustees of Bricklayers Local No. 3 Pension Trust v. Huddleston, 2013 WL 2181532, at *5 (N.D.Cal.2013) (discussing split of authority). The undersigned agrees with the conclusion of Judge Corley, in Huddleston, that the approach that is most consistent with the language of § 1132(g) and the reasoning of Idaho Plumbers is the one that has found that liquidated damages on contributions paid before the action is initiated are not available under ERISA even if other months were unpaid at the time the action was filed. See id. By the same logic, the undersigned finds that if a portion of the contributions due for a particular month are paid before an action is initiated, the trust fund may not recover liquidated damages and interest under ERISA on those
Another disagreement relates to contributions that came due after the action was filed. At least one court in this district has held that under Idaho Plumbers, liquidated damages are not available under ERISA for contributions that become delinquent after suit is filed, even if they remain unpaid at the time a judgment is entered. See Board of Trustees v. Udovch, 771 F.Supp. 1044, 1053 (N.D.Cal. 1991). On the other hand, in Roofers Local Union No. 81 v. Wedge Roofing, Inc., 811 F.Supp. 1398 (N.D.Cal.1992), the "court awarded liquidated damages for contributions that became delinquent after suit was filed and remained unpaid, reasoning that to deny them would be to force trust funds to file successive lawsuits for each new delinquent contribution and would frustrate ERISA's goals of deterring violations and compensating funds for such violations." Board of Trustees v. B.D. Bridon, Inc., 1995 WL 573701, at *3 (N.D.Cal. Sept. 19, 1995) (citing Wedge Roofing, 811 F.Supp. at 1401-1402). The undersigned finds the reasoning of Wedge Roofing to be persuasive. Therefore, the Court concludes that contributions that come due after an action is filed may give rise to an award of liquidated damages and interest under ERISA, both where the contributions remain unpaid when judgment is entered and where they have already been paid by the time judgment is entered.
In order to determine the amount to which Plaintiffs are entitled, the Court must first address whether the collection policies and practices used by Plaintiffs to determine when a particular contribution has been paid and to calculate liquidated damages and interest are consistent with the terms of the Trust Agreements and ERISA. In particular, the Court addresses the following three policies and practices: 1) the practice of applying all payments from Westech to the oldest outstanding contribution first; 2) the practice of waiting to process any payments for a particular month (or positive account balances) until the full amount for that month has been received, see Declaration of Sandy Stephenson in Support of Reply to Defendant Westech Roofing's Opposition to the Amounts Stated in the Board of Trustees et al. Motion for Default Judgment ("March 4, 2014 Stephenson Decl.") ¶ 12;
Under ERISA, the trustees of employee benefit plans have broad discretion as to their accounting practices where the relevant trust agreement vests discretionary power in the trustees to construe
First, in arbitrarily deciding to consider amounts that have, in fact, been paid as being unpaid for the purposes of calculating liquidated damages and interest until the full months' contribution has been received, Plaintiffs have adopted a policy that directly conflicts with the language of the trust agreements. The trust agreements provide for liquidated damages and interest only on payments that are actually delinquent or unpaid. Further, as discussed above, employer liability is limited to the liabilities that are expressly set forth or authorized in the Trust Agreements, the CBA or the employers' individual contribution agreements. To the extent Plaintiffs' practice imposes liability for making incomplete payments (by charging liquidated damages and interest on amounts that have already been paid on the basis that the full amount for the month has not been paid), it amounts to an additional liability beyond those that are set forth or authorized in the Trust Agreements. Thus, the practice is clearly in conflict with the Trust Agreements. The Court also notes that the statement in the March 4, 2014 Stephenson Declaration that the administrator cannot process partial payments is contradicted by the express language of the Health and Welfare Trust Agreement, which sets forth specific rules regarding the allocation of partial payments. See April 18, 2014 Stephenson Decl., Ex. GG (Health and Welfare Trust Agreement) at ECF p. 21.
Second, while the Trust Agreements permit the trustees to adopt reasonable rules and regulations relating to the collection of delinquent contributions, the policy of collecting interest on liquidated damages—which is not authorized under any of the Trust Agreements—amounts to the imposition of an additional liability on employers beyond the liability authorized under the Trust Agreements. Therefore, this policy, like the policy discussed above, is in direct conflict with the language of the Trust Agreements and constitutes an abuse of discretion by the Trust Funds.
The Court does not rely on Plaintiffs' calculation of contributions owed, liquidated damages and interest because those calculations are based on accounting policies and practices that the Court has rejected, as discussed above. In addition, some of Plaintiffs' calculations appear to be incorrect.
In calculating these amounts, the Court has relied on the Stephenson declarations stating the contribution amounts due (both total contributions due and contributions due only to the plans covered by ERISA) and the "Payment and Processing" spreadsheets (hereinafter, the "spreadsheets") supplied by Plaintiffs, which reflect the payments made by Westech and the running balance on its account. See March 4, 2014 Stephenson Decl., Ex. Z; April 18, 2014 Stephenson Decl., Ex. BB; May 5, 2014 Stephenson Declaration, Ex. NN. The Court notes that although Westech initially asserted that Plaintiffs had failed to account for certain payments it had made to the Trust Funds, following the supplemental brief submitted by Plaintiffs on April 18, 2014, which addressed each of the payments Plaintiffs had allegedly failed to account for, Westech stipulated that the figures offered by Plaintiffs as to the amount of contributions it owed were correct, implicitly conceding that Plaintiffs have accounted for all of Westech's payments. See Westech Roofing Response to Board of Trustees Et Al. Supplemental Briefing in Support of Motion for Default Judgment ("April 28, 2014 Westech Response") at 2.
The spreadsheets reflect payments made by Westech and the amounts that were processed for each month; the latter amounts include contributions due both to the ERISA plans and the non-ERISA plan. Although Plaintiffs are not entitled to liquidated damages and interest on the non-ERISA contributions, Westech does not dispute that it owed these non-ERISA contributions and therefore the Court concludes that it may rely on the running balances supplied by Plaintiffs to determine the amount of liquidated damages and interest available on the ERISA contributions. To the extent that Plaintiffs have offered no evidence as to how they would have allocated partial payments as between the ERISA plans and the one non-ERISA plan had they processed these payments when they were received, the Court takes the approach most favorable to Westech; in particular, the Court assumes that for any given month's contributions, those due to the ERISA plans would be paid first.
Westech owed $28,079.00 in fringe benefit contributions for the month of June 2012. April 18, 2014 Stephenson Decl., ¶ 43. Of that amount, $27,331.75 was owed to employee benefit plans covered by ERISA. Id. On July 31, 2012, these contributions became delinquent. See id. Although Westech made several payments to Plaintiffs on July 17, 2012, all were used to pay outstanding contributions for prior months, namely, February through April 2012. Id. Ex. BB (stream of payments). On August 9, 2012, however, Westech made a payment in the amount of $8,000. Id. At that point, Plaintiffs processed the May 2012 contribution payment, leaving a positive balance of $4,918.13 to be applied to the June 2012 contribution obligation. Assuming all of this amount would have been applied to the ERISA plan contributions, the remaining contributions due to the ERISA plans for June 2012 amounted to $22,413.62 as of August 9, 2012. Id. The balance of the June 2012 contributions was paid in December 2012, with a payment for $27,000 that was received on December 5, 2012. Id. Thus, while the entire amount due for June 2012 was delinquent, only $22,413.62 of the ERISA plan contributions for that month remained unpaid as of the time the complaint in this action was filed, on November 2, 2012.
As discussed above, the undersigned finds the reasoning in Huddleston to be persuasive as to the application of Idaho Plumbers to contributions that were delinquent but paid before the complaint was filed. Therefore, Plaintiffs are entitled to liquidated damages under ERISA only as to the amount that was unpaid when the complaint was filed, giving rise to liquidated damages of $4,482.72. As to the remaining $4,918.13 that was delinquent but paid at the time the complaint was filed, Plaintiffs are entitled to liquidated damages on that amount only if they are available under federal common law as a matter of contract. As Plaintiffs have made no showing, however, that the 20% liquidated damages provision contained in the Trust Agreements meets the requirements of federal common law, the Court finds that they may not recover liquidated damages on this portion of the June 2012 contributions.
With respect to the interest calculation for June 2012, interest is available under ERISA on the $22,413.62 that was unpaid at the time the complaint was filed. That portion of the June contributions became delinquent on July 31, 2012 and was paid on December 5, 2012, a period of 127 days. At 10% simple interest per annum, the daily rate is $6.14/per day, giving rise to interest of $779.87 for the portion of the June contributions that were paid after this action was filed. As to the portion of
Westech owed $27,468.00 in fringe benefit contributions for the month of July 2012. April 18, 2014 Stephenson Decl., ¶ 44. Of that amount, $26,743.50 was owed to employee benefit plans covered by ERISA. Id. On August 31, 2012, these contributions became delinquent. See id. ¶ 45. The entire amount due remained unpaid until December 12, 2012, when Westech sent Plaintiffs a payment for $50,000. Id., Ex. BB. Because the entire contribution was delinquent and unpaid at the time the complaint was filed, Plaintiffs are entitled to 20% liquidated damages under on the full amount due to the ERISA plans, that is,
Westech owed $12,950.06 in fringe benefit contributions for the month of August 2012. April 18, 2014 Stephenson Decl., ¶ 47. Of that amount, $12,588.00 was owed to employee benefit plans covered by ERISA. Id. On September 30, 2012, these contributions became delinquent. The entire amount due remained unpaid until December 12, 2012, when Westech sent Plaintiffs a check for $50,000. Id., Ex. BB. Because the entire contribution was delinquent and unpaid at the time the complaint was filed, Plaintiffs are entitled to 20% liquidated damages under 29 U.S.C. § 1132(g) on the full amount due to the ERISA plans, that is,
Westech owed $9,816.18 in fringe benefit contributions for the month of September 2012. April 18, 2014 Stephenson Decl., ¶ 49. Of that amount, $9,535.50 was owed to employee benefit plans covered by ERISA. Id. On October 31, 2012, these contributions became delinquent. The entire amount due remained unpaid until December 12, 2012, when Westech submitted a payment for $50,000. Id., Ex. BB. Because the entire contribution was delinquent and unpaid at the time the complaint was filed, Plaintiffs are entitled to 20% liquidated damages under 29 U.S.C. § 1132(g) on the full amount due to the ERISA plans, that is,
Westech owed $12,492.52 in fringe benefit contributions for the month of October 2012. April 18, 2014 Stephenson Decl., ¶ 51. Of that amount, $12,130.00 was owed to employee benefit plans covered by ERISA. Id. On November 30, 2012, after the complaint was filed, these contributions became delinquent. A portion of the October 2012 contributions ($3,604.89) was paid from the December 12, 2012 payment and the remainder of the October 2012 contributions ($8,525.11) was paid on December 21, 2012. Id.; see also April 18, 2014 Stephenson Decl., Ex. BB. As discussed above, under Wedge Roofing, Plaintiffs are entitled under ERISA to liquidated damages and interest on contributions that come due after the complaint is filed and remain unpaid or are paid late. Therefore, Plaintiffs are entitled to 20% liquidated damages on the full amount due to the ERISA plans for October 2012, that is,
Westech owed $19,813.08 in fringe benefit contributions for the month of November 2012. April 18, 2014 Stephenson Decl., ¶ 53. Of that amount, $19,254.25 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on December 31, 2013. After the October 2012 contributions were processed, a balance of $5,488.37 left from the December 21, 2012 payment remained available for the November 2012 contributions. April 18, 2014 Stephenson Decl., Ex. BB. Consequently, only $13,765.88 of the November 2012 contributions was delinquent. Plaintiffs are entitled under ERISA to 20% liquidated damages on that amount, that is,
Westech owed $ 10,099.86 in fringe benefit contributions for the month of December 2012. April 18, 2014 Stephenson Decl., ¶ 55. Of that amount, $9,824.25 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on January 31, 2013. The entire amount was delinquent as it was paid by Westech in installments that were received by Plaintiffs on February 13, 2013, February 28, 2013 and March 19, 2013. April 18, 2014 Stephenson Decl., Ex. BB. Therefore, Plaintiffs are entitled under ERISA
Plaintiffs are entitled to interest on the entire amount of the December 2012 contributions due to the ERISA plans for the thirteen days between January 31, 2013 and February 13, 2013. At 10% simple interest per annum, the daily rate on that amount is $2.69/per day, giving rise to interest of $34.97. Following the February 13, 2013 payments, there was a balance on Westech's account of $415.29 available for the December 2012 contributions, leaving $9,408.96 due. April 18, 2013 Stephenson Decl., Ex. BB. As to this amount, Plaintiffs are entitled to interest for the fifteen days between the February 13, 2013 payment and the next payment, made on February 28, 2013. At a daily rate of $2.58/day, interest for that period is $38.70. On February 28, 2013, Westech made a payment of $1,000, leaving $8,408.96 due for December 2012. As to this amount, Plaintiffs are entitled to interest for the nineteen days between February 28, 2013 and March 19, 2013, when the next payment was made. At a daily rate of $2.30, the interest for this period is $43.70. The March 19, 2013 payment was for $15,000 which covered the remainder of the outstanding contributions for December 2012, leaving a balance of $6,315.43. The
Westech owed $ 15,674.38 in fringe benefit contributions for the month of January 2013. April 18, 2014 Stephenson Decl., ¶ 57. Of that amount, $15,245.25 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on February 28, 2013. The entire amount was delinquent as it was paid by Westech in installments that were received by Plaintiffs on March 19, 2013 (the $15,000 payment discussed above), March 28, 2013, March 29, 2013 and April 2, 2013. April 18, 2014 Stephenson Decl., Ex. BB. Therefore, Plaintiffs are entitled under ERISA to 20% liquidated damages on the full amount of the January 2013 contributions owed to ERISA plans, that is,
Plaintiffs are entitled to interest on the entire amount of the January 2013 contributions due to the ERISA plans ($15,245.25) for the 19 days between February 28, 2013 and March 19, 2013. At 10% simple interest per annum, the daily rate on that amount is $4.18/per day, giving rise to interest of $79.42. Following the March 19, 2013 payment, there was a balance on Westech's account of $6,315.43 available for the January 2013 contributions, leaving $8,929.82 due to the ERISA plans. April 18, 2013 Stephenson Decl., Ex. BB. As to this amount, Plaintiffs are entitled to interest for the nine days between the March 19, 2013 payment and the next payment, made on March 28, 2013. At a daily rate of $2.45/day, interest for that period is $22.05. The March 28, 2013 payment was for $4,500, leaving $4,429.82 of the January 2013 ERISA contributions unpaid. Plaintiffs are entitled to interest for one day on this amount at a rate of $1.21/day. The remainder of the outstanding January 2013 contributions was paid the next day, on March 29, 2013, when Westech made a payment for $7,815. Thus, the
Westech owed $14,406.52 in fringe benefit contributions for the month of February
Plaintiffs are entitled to interest on the delinquent amount of the February 2013 contributions due to the ERISA plans ($11,060.70) for the 2 days between March 31, 2013 and April 2, 2013, when the next payment, in the amount of $1,000 was received. At 10% simple interest per annum, the daily rate on that amount is $3.03/per day, giving rise to interest of $6.06. Following the April 2, 2013 payment, there was a balance due for the February 2013 ERISA contributions of $10,060.70. As to this amount, Plaintiffs are entitled to interest for the 30 days between the April 2, 2013 payment and the next payment, made on May 2, 2013. At a daily rate of $2.76/day, interest for that period is $82.80. The May 2, 2013 payment was for $21,548.70 and paid in full the February 2013 contributions. Thus, the
Westech owed $22,629.04 in fringe benefit contributions for the month of March 2013. April 18, 2014 Stephenson Decl., ¶ 61. Of that amount, $22,011.00 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on April 30, 2013. The payment from May 2, 2013 left a balance of $11,098.23 available for the March 2013 contributions. The remainder of the March 2013 contributions was covered by a check received on May 20, 2013 for $11,530.81. April 18, 2014 Stephenson Decl., Ex. BB. As the entire amount of March 2013 ERISA contributions due was delinquent, Plaintiffs are entitled to
Plaintiffs are entitled to interest on the full amount of the March 2013 contributions due to the ERISA plans ($22,011.00) for the 2 days between April 30, 2013 and May 2, 2013, when the next payment, in the amount of $21,548.70 was received. At 10% simple interest per annum, the daily rate on that amount is $6.03/per day, giving rise to interest of $12.06. Following the May 2, 2013 payment (part of which was used for the February 2013 contributions), a balance of $11,098.23 remained available for the March 2013 contributions. Thus, the amount of the March 2013 ERISA contributions due as of May 2, 2013 was $10,912.77. As to that amount, Plaintiffs are entitled to interest for the 18 days between the May 2, 2013 payment and the next payment, made on May 20, 2013, which covered the remainder of the March 2013 ERISA contributions. At a daily rate of $2.99/day, interest for that period is $53.82. Thus, the
Westech owed $18,519.60 in fringe benefit contributions for the month of April 2013. April 18, 2014 Stephenson Decl., ¶ 63. Of that amount, $18,026.25 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on May 31, 2013. Plaintiffs received a payment of $5,181.30 on May 20, 2013 and that full amount was available for the April 2013 contributions. April 18, 2014 Stephenson Decl., Ex. BB. Thus, $12,844.95 of the April 2013 ERISA contributions were delinquent, giving rise to
Plaintiffs are entitled to interest on the delinquent amount of the April 2013 contributions due to the ERISA plans ($12,844.95) for the 6 days between May 31, 2013 and June 6, 2013, when the next payment, in the amount of $779.93 was received. At 10% simple interest per annum, the daily rate on that amount is $3.52/per day, giving rise to interest of $21.12. Sometime after the June 6, 2013 payment, Westech was charged $3,750.04 to correct for the misclassification of one of its employees for the months of October 2012 through March 2013. April 18, 2014 Stephenson Decl., ¶ 64. Westech does not challenge the charge. As Plaintiffs have not provided the date upon which this amount was charged against Westech, the Court assumes that this charge accrued on July 11, 2013, when Westech made its next payment, in the amount of $15,000. Therefore, between June 6, 2013 and July 11, 2013, Westech owed $12,065.02 (that is, $12,844.95 minus $779.93) in April 2013 ERISA contributions. For this period of 35 days, the daily interest rate was $3.31/day, giving rise to interest in the amount of $115.85. On July 11, 2013, Westech made a payment of $15,000. The Court deducts the $3,750.04 charge from this amount, leaving a balance of $11,249.96 for the April 2013 ERISA contributions. Thus, from July 11, 2013 to July 19, 2013, when the next payment was made, Westech owed $81.06 on the April 2013 ERISA contributions. For those 8 days, the interest rate was $.22/day, giving rise to interest of $1.76. On July 19, 2013 a check for $20,000 was received from Westech, paying off the April 2013 ERISA contributions. Thus, the
Westech owed $21,550.08 in fringe benefit contributions for the month of May 2013. April 18, 2014 Stephenson Decl., ¶ 66. Of that amount, $20,819.25 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on June 30, 2013. No payments on the May 2013 ERISA contributions were made until July 19, 2013 so the entire amount due on the May 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
Plaintiffs are entitled to interest on the full amount of the May 2013 contributions due to the ERISA plans ($20,819.25) for the 19 days between June 30, 2013 and July 19, 2013, when the next payment, in the amount of $20,000 was received. At 10% simple interest per annum, the daily rate on that amount is $5.70/day, giving rise to interest of $108.30. Following the July 19, 2013 payment (part of which was used for the April 2013 contributions), a balance of $18,691.59 remained available for the May 2013 contributions. Thus, the amount of the May 2013 ERISA contributions due as of July 19, 2013 was $2,127.66. As to that amount, Plaintiffs are entitled to interest for the 17 days between the July 19, 2013 payment and the next payment, made on August 5, 2013, which covered the
Westech owed $27,728.16 in fringe benefit contributions for the month of June 2013. April 18, 2014 Stephenson Decl., ¶ 68. Of that amount, $26,875.50 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on July 31, 2013. No payments on the June 2013 ERISA contributions were made until August 5, 2013 so the entire amount due on the June 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
The June 2013 ERISA contributions were covered by the payment on August 5, 2013 (which left a balance of $3,907.16 after the May 2013 contributions were processed), August 22, 2013 ($6,387.70), September 9, 2013 ($2,810.88), September 12, 2013 ($7,839.62), September 19, 2013 ($3,521.70), October 22, 2013 ($2,785.26).
Westech owed $24,093.02 in fringe benefit contributions for the month of July 2013. April 18, 2014 Stephenson Decl., ¶ 70. Of that amount, $23,442.37 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on August 31, 2013. No payments on the July 2013 ERISA contributions were made until November 12, 2013 so the entire amount due on the July 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
On November 12, 2013, Plaintiffs received two payments from Westech, in the amounts of $5,413.30 and $9,950.99. After the June 2013 contributions were processed, $14,888.45 remained for the July 2013 contributions. Thus, Plaintiffs are entitled to interest on the full amount of the unpaid ERISA contributions ($23,442.37) for the 73 days between August 31, 2013 and November 12, 2013 at a rate of $6.42/day, that is, $468.66. Following the November 12, 2013 payments, the amount owed for the July 2013 ERISA contributions
Westech owed $31,958.30 in fringe benefit contributions for the month of August 2013. April 18, 2014 Stephenson Decl., ¶ 72. Of that amount, $31,076.50 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on September 30, 2013. No payments on the August 2013 ERISA contributions were made until December 24, 2013 so the entire amount due on the August 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
On December 24, 2013, two payments were made by Westech and the July 2013 contributions were processed, leaving $29,578.37 available for the August 2013 ERISA contributions. Thus, for the 85 days between September 30, 2013 and December 24, 2013, Plaintiffs are entitled to interest on $31,076.50 at a rate of $8.51/day, that is, $723.35. As of December 24, 2013, Westech owed $1,498.13. Plaintiffs are entitled to interest on that amount for the thirty days between December 24, 2013 and January 23, 2014, when the next payment was made. At a rate of $.41/day, Plaintiffs are entitled to $12.30 for this period. With the January 23, 2014 payment Westech paid off all of its outstanding contributions for August 2013. Therefore, Plaintiffs are entitled to
Westech owed $24,267.26 in fringe benefit contributions for the month of September 2013. April 18, 2014 Stephenson Decl., ¶ 74. Of that amount, $23,598.30 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on October 31, 2013. No payments on the September 2013 ERISA contributions were made until January 23, 2014 so the entire amount due on the September 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
For the 84 days between October 31, 2013 and January 23, 2014, Plaintiffs are entitled to interest on the full amount of ERISA contributions due ($23,598.30). As a rate of $6.47/day, the interest for this period is $537.01. On January 23, 2014, Westech made a payment in the amount of $7,654.50. After the August 2013 contributions were processed, a balance of $5,274.57 remained for the September 2013 contributions. Thus, as of January 23, 2014, Westech owed $18,323.73 in September 2013 ERISA contributions. For the one-day period between January 23, 2014
Westech owed $20,593.00 in fringe benefit contributions for the month of October 2013. April 18, 2014 Stephenson Decl., ¶ 76. Of that amount, $20,024.10 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on November 30, 2013. No payments on the October 2013 ERISA contributions were made until January 27, 2014 so the entire amount due on the October 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
For the 58 days between November 30, 2013 and January 27, 2014, Plaintiffs are entitled to interest on the full amount owed to the ERISA plans ($20,024.10) at a rate of $5.49/day, that is, $318.42. The October 2013 ERISA contributions were paid in full with the January 27, 2014 payment. Therefore,
Westech owed $30,478.55 in fringe benefit contributions for the month of November 2013. April 18, 2014 Stephenson Decl., ¶ 78. Of that amount, $29,638.20 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on December 31, 2013. No payments on the November 2013 ERISA contributions were made until January 27, 2014 so the entire amount due on the November 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
For the 27 days between December 31, 2013 and January 27, 2014, Plaintiffs are entitled to interest on the full amount owed to the ERISA plans ($29,638.20) at a rate of $8.12/day, that is, $219.24. On January 27, 2014, Westech made a payment of $58,100.81. After the contributions for September 2013 and October 2013 were processed, $24,743.12 remained for the November 2013 ERISA contributions. Thus, as of January 27, 2014, Westech owed $4,895.08 on the November 2013 ERISA contributions. Plaintiffs are entitled to interest on that amount for the 35 days between January 27, 2014 and March 3, 2014, when the next payment was made. The daily rate for this period is $1.34, giving rise to interest in the amount of $46.90. The March 3, 2014 payment paid in full the November 2013 ERISA contributions. The
Westech owed $25,244.34 in fringe benefit contributions for the month of December 2013. April 18, 2014 Stephenson Decl., ¶ 80. Of that amount, $24,529.50 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on January 31, 2014. No payments on the December 2013 ERISA contributions were made until March 3, 2014 so the entire amount due on the December 2013 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
Westech owed $30,843.54 in fringe benefit contributions for the month of January 2014. April 18, 2014 Stephenson Decl., ¶ 82; see also May 5, 2014 Stephenson Decl., ¶ 50. Of that amount, $30,002.70 was owed to employee benefit plans covered by ERISA. Id. These contributions were due on February 28, 2014. No payments on the January 2014 ERISA contributions were made until April 1, 2014, so the entire amount due on the January 2014 ERISA contributions was delinquent. Therefore, Plaintiffs are entitled to
For the 32 days between February 28, 2014 and April 1, 2014, Plaintiffs are entitled to interest on the full amount owed to the ERISA plans for January 2014 ($30,002.70) at a rate of $8.22/day, that is, $263.04. On April 1, 2014, Westech made a payment in the amount of $3,872.50, which satisfied the remaining amount owed by Westech for December 2013 and left $1,209.53 to be applied towards the January 2014 contributions. May 5, 2014 Stephenson Decl., Ex. NN. Consequently, as of April 1, 2014, Westech owed $28,793.17 in ERISA contributions for January 2014. Plaintiffs are entitled to interest on that amount for the 28 days between April 1, 2014 and April 29, 2014, when Westech made its next payment, at a rate of $7.89, giving rise to interest in the amount of $220.92 for this period. The payment on April 29, 2014 was for $2,651.29. Thus, as of that date, $26,141.88 was owed to the ERISA plans for January 2014. Plaintiffs are entitled to interest on this amount, at a rate of $7.16, for the three days until the next payment was made, on May 1, 2014, that is $21.48. The May 1, 2014 payment was in the amount of $1,050.75 and therefore, as of May 1, the amount owed on ERISA contributions for January 2014 was $25,091.13. Plaintiffs were entitled to interest for one day on that amount, at a rate of $6.87. The next day, another payment was made, in the amount of $1,175.50,
Westech owed $26,992.38 in fringe benefit contributions for the month of February 2014. April 18, 2014 Stephenson Decl., ¶ 84. Of that amount, $26,255.30 was owed to employee benefit plans covered by
Month ERISA Contributions Liquidated Damages Interest Accrued Remaining Unpaid as of May 5, 2014 6/12 $0 $4,482.72 $792.02 7/12 $0 $5,348.70 $754.99 8/12 $0 $2,517.60 $251.85 9/12 $0 $1,907.10 $109.62 10/12 $0 $2,426 $60.90 11/12 $0 $2,753.18 $165.88 12/12 $0 $1,964.85 $117.37 1/13 $0 $3,049.05 $102.68 2/13 $0 $2,212.14 $88.86 3/13 $0 $4,402.20 $65.88 4/13 $0 $2,568.99 $138.73 5/13 $0 $4,163.85 $118.16 6/13 $0 $5,375.10 $269.88 7/13 $0 $4,688.47 $532.55 8/13 $0 $6,215.30 $735.65 9/13 $0 $4,719.66 $551.96 10/13 $0 $4,004.82 $318.42 11/13 $0 $5,927.64 $266.14 12/13 $0 $4,905.90 $223.98 1/14 $23,915.63 $6,000.54 $623.66 2/14 $26,255.30 $5,251.06 $352.31TOTAL : $50,170.93 $84,884.87 $6,641.49
Plaintiffs are entitled to attorneys' fees under ERISA and the Trust Agreements. 29 U.S.C. § 1132(g)(2)(D). For time spent on this action from April 11, 2013, when Eileen Bissen substituted in as counsel for Michael Carroll,
Under 29 U.S.C. § 1132(g)(2), an employee benefit plan that prevails in an enforcement action for unpaid contributions is entitled to reasonable attorneys' fees. Although the Court requested additional materials in support of Plaintiffs' Motion and ultimately did not accept Plaintiffs' calculations, the Court does not find that the time spent by Plaintiffs' counsel on this action was unreasonable. Westech's long history of non-compliance (which continued throughout this action) accompanied by sporadic and incomplete payments, meant that Plaintiffs and the Court were faced with a constantly moving target. Further, Westech's own initial failure to file a meaningful opposition, followed by vague assertions in its subsequent brief that Plaintiffs had not accounted for all of its payments (which later turned out to be incorrect) contributed to the fees incurred by Plaintiffs. Therefore, the Court awards fees for the full amount of time requested by Plaintiffs (25.4 hours) at Ms. Bissen's rate of $225/hour, that is, $5,715.00.
Under Civil Local Rule 54-3, an award of costs may include the Clerk's filing fee and fees for service of process "to the extent reasonably required and actually incurred." In addition, the Trust Agreements provide for the recovery of all expenses incurred in collection. Plaintiffs have documented $407.84 in costs. See January 23, 2014 Bissen Decl., ¶ 10; April 18, 2014 Bissen Decl., ¶ 4. That amount is awarded in full.
For the reasons stated above, the Motion is GRANTED. The Court awards the following amounts in damages: 1) $50,170.93 in unpaid contributions for the months of January and February 2014; 2) $84,884.87 in liquidated damages; 3) $6,641.49 in interest; 4) $5,715.00 in attorneys' fees; and 5) $407.84 in costs. Any payments that have been made to Plaintiffs by Westech since May 5, 2014 shall be deducted from these amounts.
In additions, the Court invites Plaintiffs to file a request for entry of a permanent injunction consistent with the injunctive relief requested in Plaintiffs' Complaint. In their Complaint, Plaintiffs requested that the Court enjoin defendant from violating the terms of the collective bargaining agreement and the Trust Agreements.